1000 Albums Project

Reviewed

Here’s a list of all the albums reviewd in the project this far, and their scores. I’ll be linking each item in this list to its appropriate review, but as you’ll appreciate that’s A Job so this will suffice for now.

I’ll update this when I can with the newest reviews.

Album Artist Source #
…are the Dark Horse Besnard Lakes Stuart Emerson 6
[self titled] Morgan Delt Stuart Emerson 4
1000 Forms of Fear Sia Sara-Jane Davies 7
18 Moby Liberty Dent 5
Aida James Levine Mik Parkin 4
All Pop No Star The Slingbacks Stuart Emerson 7
Anon. Hands Like Houses Rob Catton 7
Apollo Brian Eno Mik Parkin 2
Aqualung Jethro Tull Stuart Taylor 7
Aquemini OutKast Krystian Musztafa 5
Architecture and Morality Orchestral Manoeuvres in the Dark Bryan Connolly 2
Around The Fur Deftones Craig Scott 6
Artifical Selection Dance Gavin Dance Todd Beckett 5
Attak KMFDM Stuart Emerson 7
Bahamut Hazmat Modine Matt Smith 8
Best of Dolly Parton (GP) Dolly Parton Matt Smith 8
Black Rainbow Sound Menace Beach Stuart Emerson 7
Black Sands Bonobo Jamie Walsh 6
Blast Tyrant Clutch Alex Hamilton 7
Blonde Frank Ocean Alfie Bennett 4
Blue Horse The Be Good Tanyas Dreena Jane 6
Blue Monk Thelonious Monk Simon Rodway 5
Boccherini Cello Concerto 1 and 2 Haydn Bryan Connolly 3
Boko Mien Ibibo Sound Machine Dan Hiscutt 8
Bushfire Fairytales Jack Johnson Stuart Taylor 8
Calling out of Context Arthur Russell Liberty Dent 4
Cheer Up! Reel Big Fish Daniel Lettin 8
Chocolate Starfish and the Hotdog Flavoured Water Limp Bizkit Andy Scott-Morrissey 5
Chronicle Creedence Mel Connolly 7
Cohere Alex Vargus Dave Parkinson 6
Collector’s Item Twelfth Night Bryan Connolly 5
Complete Symphonies Vaugh Williams Bryan Connolly 4
Completely Canadian Compilation Arrogant Wurms Nick Hall 4
Conqueror Mechina Craig Jones 4
Crash talk SchoolboyQ Krystian Musztafa 5
Crush 2NE1 Noli-Rose Nikitaki 6
Dark Side of the Moon (1) Pink Floyd Nicholas Fitterson 9
Dark Side of the Moon (2) The Flaming Lips and Stardeath and White Dwarfs Simon Rodway 4
Darkest Darks, Lightest Lights The White Buffalo Mark Davis 6
Decompositions: Volume Number One Circle takes the Square Rob Wagner 4
Deja Entendu Brand New Craig Scott 6
Demon Days Gorillaz Alfie Bennett 7
Designer Aldous Harding Paul Wray 7
Devdas Sountrack Soundtrack Peet Denny 6
Devouring Radiant Light Skeletonwitch Noli-Rose Nikitaki 5
Different Stages Rush Stuart Taylor 7
Disko Partizani Shantel Stuart Taylor 7
Divine Madness (FA) Madness Tom Ross 9
Doggystyle Snoop Doggy Dogg Krystian Musztafa 6
Dookie Green Day Stuart Legg 6
Dope Shit Russkaja Stuart Taylor 6
Doppelganger Curve Stuart Emerson 8
Doppelganger The Fall of Troy Todd Beckett 8
Eden Burning (GP) Brink Stuart Taylor 5
Effloresce Covet Dylan Smith 7
Either / Or Elliot Smith Stuart Taylor 5
Ella and Louis Ella Fitzgerald and Louis Armstrong Dreena Jane 6
Enter the Stream Prana Crafter Stuart Emerson 2
Epicloud Devin Townsend Project Dave Parkinson 8
Everybody Down Kate Tempest Phillip Staines 6
Everybody Knows This Is Nowhere Neil Young Mike Wootton 6
Everywhere At The End Of Time Mr Caretake Stuart Taylor 1
Exsolve Jo Quail Luke Kay 7
First and Last and Always Sisters of Mercy Stuart Legg 6
Flying in a Blue Dream Joe Satriani Dan Croft 5
Follow the Leader KoRn Andy Scott-Morrissey 7
For Ever Jungle Jamie Walsh 6
Forever Changes Love Saira Gorringe 5
From Mars to Sirius Gojira (From Mars oj Mars Danny Nuttall 6
From The Fires Greta Van Fleet Phillip Staines 9
Goi Rode Goi! Аркона (Arkona) Noli-Rose Nikitaki 6
Green River Creedence Clearwatre Revival Danny Nuttall 7
Grinderman Grinderman Simon Rodway 6
Groove Family Cyco Infectious Grooves Noli-Rose Nikitaki 5
Guilty Barbra Streisand Sara-Jane Davies 3
Hands Are Made For Working Guvna B Andy Scott-Morrissey 4
Happiness Dance Gavin Dance Todd Beckett 5
Have You In My Wilderness Julia Holter Paul Wray 6
Hellfire Club Edguy Owen Pauling 7
Hello Nasty Beastie Boys Stuart Taylor 6
Hold your colour Pendulum Jamie Walsh 6
Homogenic Björk Paul Wray 9
Hypersonic Missiles Sam Fender Phillip Staines 8
If I Should Fall from Grace with God The Pogues Mik Parkin 7
If The Beatles Had Read Hunter The Wonder Stuff Mike Major 7
If You Wait London Grammar Paul Wray 5
Imaginary Man Rayland Baxter Mal Stuthridge 7
Imaginations from the Other Side Blind Guardian Ross Silcock 5
In Absentia Porcupine Tree Dave Parkinson 6
In Silico
Pendulum
Andy Scott-Morrissey 7
In The Skies Peter Green Lee Brook 5
Infest Papa Roach Andy Devine 5
Into The Black Kittie John Ingham 5
Jade Bird Jade Bird Phillip Staines 8
Jagged Little Pill Alanis Morissette Sara-Jane Davies 8
Jomsviking Amon Amarth Noli-Rose Nikitaki 5
Joy as an act of resistance IDLES Claire Haggar 6
Kezia Protest the Hero Rob Wagner 4
Kick INXS Sara-Jane Davies 8
Kite Kirsty Maccoll Dreena Jane 8
Kveikur Sigur Ros Nicholas Fitterson 6
Labour Days Aesop Rock Matt Smith 6
Ladies and Gentlemen, We Are Floating In Space Spiritualized Ashley Rogers 7
Land of the Blind Half Past Four Paul Wray 8
Last Meal Snoop Dogg Andy Devine 5
Laune Der Natur Die Toten Hosen Alex Hamilton 5
Leftism Leftfield Alex Hamilton 5
Legally Blonde The Musical [OBC] Soundtrack Rob Wagner 5
Legend Bob Marley Mike Major 5
Life of Pablo Kanye West Alfie Bennett 6
Live and Dangerous Thin lizzy Matt Smith 6
Live at the Star Club Jerry Lee Lewis Mike Wootton 6
Los Angeles Flying Lotus Jamie Walsh 1
Loved to Death Dance with the Dead Noli-Rose Nikitaki 7
Mad Apple Circus Mad Apple Circus Alex Hamilton 8
Made in the Manor Kano Alfie Bennett 5
Man Alive (1) Everything Everything Peet Denny 6
Man Alive (2) The 4 of Us Sara-Jane Davies 7
MCMXC a.D. Enigma Owen Pauling 5
Meat Puppets II Meat Puppets Owen Pauling 4
Mechanical Animals Marilyn Manson Owen Pauling 6
Metal Galaxy Babymetal Rob Wagner 9
Milk-eyed Mender Joanna Newsome Peet Denny 6
Monster REM Mike Wootton 6
More Late Night Transmissions Jaya the Cat Alex Hamilton 8
Music to Die Alone In Space To Bill Boulden Stuart Emerson 4
New Boots and Panties Ian Dury Bryan Connolly 3
No More Idols Chase and Status Andy Scott-Morrissey 8
Ok Talvin Singh Simon Rodway 5
Onset of Putrefaction Necrophagist Danny Nuttall 4
Operation Mindcrime Queensryche Dave Parkinson 7
Page Avenue Story Of The Year Craig Scott 6
Painting Signs Eric Bibb Dreena Jane 8
Panic Prevention Jamie T Ed Ross 7
Parry Gripp Mega-Party Parry Gripp Noel Bresland 3
People Hothouse Flowers Sara-Jane Davies 6
Peripheral Vision Turnover Todd Beckett 5
Periphery II Periphery Todd Beckett 6
Permutation Amon Tobin Jamie Walsh 8
Pimp a Butterfly Kendrick Lamarr Alfie Bennett 5
Play It Again, Sham (GP) The Sawdoctors Nick Hall 6
Pornograffiti Extreme Noel Bresland 6
Psychic Warfare Clutch John Ingham 8
Pyromania Def Leppard Mel Connolly 6
Queen’s Speech EP Lady Leshurr Paul Wray 5
Rave to the Grave China Shop Bull John Ingham 6
Reign In Blood Slayer Rob Wagner 8
Remind Me Tomorrow Sharon Van Etten Roy Williams 6
Rising Force Yngwie Malmsteen Neil Hodgkinson 5
ROBOT FACE Caravan Palace Alex Hamilton 5
RTJ4 Run The Jewels Paul Wray 7
Safe as Milk Captain beefheart Matt Smith 8
Sampler Bert Jansch Matt Smith 6
Scoundrel Days A-Ha Robb Sutherland 6
Shatter Me Lindsey Sterling Noli-Rose Nikitaki 7
Sheer Heart Attack Queen Bryan Connolly 7
Ska Me Crazy Tokyo Ska Paradise Matt Smith 7
Somewhere In The Between Streetlight Manifesto Alex Hamilton 6
Sound Mik Artistik’s Ego Trip Paul Wray 8
Sound and Fury Sturgill Simpson Stuart Taylor 7
Speaking In Tongues Talking Heads Nick Hall 5
Spirit of the Glen Royal Scotch Dragoon Guards Lee Brook 3
Spiritbox Spiritbox Dylan Smith 7
Spit Kittie John Ingham 6
Steal This Album System of a Down Andy Scott-Morrissey 5
Suede Suede Mike Wootton 5
Sunrise Over Sea John Butler Trio Nicholas Fitterson 8
Super Slimey Future & Young Thug Jamie Walsh 4
Swagger Flogging Molly Alex Hamilton 7
Symphony Metallica Kenneth Hall 6
Symphony No 3 Goreki Stuart Taylor 5
Syro Aphex Twin Paul Wray 7
T H E tricot Luke Kay 6
Temple of the Dog Temple of the Dog Matt Smith 6
Testing A$AP Rocky Krystian Musztafa 3
The Beetlejuice Musical Soundtrack Lea Syme 7
The Congregation Leprous Stuart Pullin 5
The Dark Pool Thornhill Dylan Smith 8
The Fat of the Land The Prodigy Jamie Walsh 8
The Head on the Door The Cure Simon Rodway 7
The Heart of the Congos The Congos Mik Parkin 5
The Money Store Death Grips Krystian Musztafa 4
The Neon Handshake Hell is for Heroes Rob Wagner 6
The Reality of My Surroundings Fishbone Peet Denny 9
The Resurrection Geto Boys Dan Jenkins 5
The Stooges The Stooges Neil Hodgkinson 5
The Strength. The Sound. The Songs Volbeat Danny Nuttall 9
The Thoughts of Emerlist Davjack Nice Bryan Connolly 5
The Unauthorized Biography of Reinhold Messner Ben Folds Five Nick Hall 8
The Undivided Five A Winged Victory for the Sullen Stuart Emerson 2
Theogonia Rotting Christ Owen Pauling 6
Things to Make and Do Moloko Sara-Jane Davies 4
Thirty Seconds to Mars Thirty Seconds to Mars Nicholas Fitterson 7
This Machine The JB Conspiracy Alex Hamilton 6
Time Will Die And Love Will Bury It Rolo Tomassi Luke Kay 6
Tokyo Jukebox Marty Friedman Noli-Rose Nikitaki 9
Tomorrow We Die Alive Born Of Osiris Dylan Smith 5
Tourist Athlete Mark Davis 4
Tracy Chapman Tracy Chapman Helene Walker 8
Transgender Street Legend Vol 1 Left at London Lea Syme 6
Treats Sleigh Bells Rob Wagner 7
Tu Alien Weaponry Stuart Pullin 7
Twin Cinema The New Pornographers Roy Williams 8
Under My Skin Avril Lavigne Rob Wagner 5
UNLOCKED Denzel Curry & Kenny Beats Krystian Musztafa 6
Up Right Said Fred Robb Sutherland 3
Urban Hymns The Verve Owen Pauling 7
Very Necessary Salt N Pepa Alex Hamilton 5
Vile Child Milk Teeth Luke Kay 5
Violator Depeche Mode Bryan Connolly 7
Voyage 34 Porcupine tree Stuart Taylor 4
Walk The Sky Alter Bridge Dave Parkinson 6
We Are Born Sia Sara-Jane Davies 7
We Started Nothing The Ting Tings Dreena Jane 5
Welcome to Loserville Son of Dork Daniel Lettin 2
White Ladder David Grey Sara-Jane Davies 4
Who Are The Girls? Nova Twins Luke Kay 6
Wisconsin Death Trip Static X Andy Scott-Morrissey 8
X Infinity Watsky Rico James 8
Yeezus Kanye West Jamie Walsh 8
Этажи Molchat Doma Krystian Musztafa 6

© 2026 1000 Albums Project

Theme by Anders Norén